Star Refinery Terrace 3 Construction Works ProjectAliağa/İzmir
- Annual 50 Million ton of crude oil processing capacity
- 3.500.000 m³ of rock excavation
- 1.000.000 m3 0-60 mm Granulated Filling
- 26.000 m3 Gabion and slope protection line manufacturing
- 92.000 m soil nail for slope production line
- 45.000 m³ concrete tank and pipe hanger foundation,
- 120.000 m² of field concrete,
- 35.000 m² road concrete
- 1.700 ton infrastructure steel trunking and Cathodic treatment systems works
- 10.000 m infrastructure drainage pipe
- 5000 m open rain water drain production
- 345 m2 area excavated by Es Group, and arranged in accordance with tank positions